top of page
Jobsite Video: 1,220-Foot HDD River Crossing After Three Failed Attempts
A real NPL Construction HDD crossing under Minnesota's Blue Earth River shows the planning, tracking, fluid control, and persistence behind a difficult 1,220-foot bore.
undergroundtruth
Aug 162 min read
Â
Â
Â
bottom of page